This is strange ... last night when I got to the Grafton parking lot, I had a MBTA transit police ticket on my car. I know for a fact I paid my $4 parking fee last night, but my ticket was for $15 for "non-payment of parking fee." I'm not even sure how to contest it. Did anyone else have a ticket as well?
The P508 was slightly off schedule this morning, arriving at South Station at 8:26 AM, about three minutes behind schedule. Last night on the P 529 (the 6;15 PM departure from South Station), we had to wait about 15 minutes for "paperwork" until we could depart. We ended up getting to Grafton about 20 minutes late. So, sadly, not enough for reimbursement.
Interesting note about reimbursements, I'm still waiting for three of them from late trains back in September.
In other train news:
According to the Boston Globe, a commuter train at North Station hit a truck parked near the tracks this morning, but no one was injured, authorities said. The inbound train was arriving from Beverly and was making its final stop when it clipped the truck just before 9 a.m., said Massachusetts Bay Transportation Authority spokesman Joe Pesaturo. Service was not delayed and passengers departed safely at North Station. The truck was parked to service a portable toilet nearby for rail employees. The driver was connecting a hose from the truck to the toilet as the accident occurred, Pesaturo said. “It’s been there in the past, but this time the driver parked too close to the tracks,” he said.
Last weekend, a Green Line train made a sudden stop, injuring some passengers. The incident happened Saturday night on the Green Line as the trolley departed North Station, heading toward Government Center. Officials tell the Boston Herald that a brake malfunctioned. WBZ-TV reported that least 10 people were hurt and four passengers were taken to area hospitals. Transit police Sgt. Bill Fredette tells the Herald that none of the injuries appeared to be serious.
Showing posts with label safety. Show all posts
Showing posts with label safety. Show all posts
Tuesday, November 17, 2009
Wednesday, November 4, 2009
MBTA Riders At Risk
According to a report released by the governor's office, a decade of neglect and mounting financial problems has left the MBTA with public safety issues that are far more serious than previously revealed and swiftly growing worse. This report was obtained by the Globe yesterday. Among the most alarming items in the report is the fact that the MBTA has left more than 50 critically important safety projects unfunded because of a “mountain of red ink.’’
One delayed project highlighted in the report, which has been deemed critical to public safety, involves repair of a water leak on the Red Line between Alewife and Harvard stations. The $80 million project would replace a system of slabs and disks, designed to absorb train vibrations, that has been damaged by water leaks. In some areas, fasteners are corroding and the tracks are moving out of alignment, the report states, presenting “the possibility of train derailment.’’The system’s age and the lack of consistent repairs has also had a direct impact on service, according to the report.
A recent fire triggered by an old cable buried under muck on the Red Line shut down rush-hour service. It also forced some bus drivers to ferry those Red Line passengers, leaving parts of their regular routes uncovered and causing inconvenience across the system. The publicity forced the MBTA to agree to replace the cable, a $140 million project, “money that will be diverted from other projects such as overhauling vehicles,’’ the report states.
The 51 deferred projects deemed critically important carry a price tag of $543 million. But the T has a total of more than $3 billion in unfunded maintenance projects it considers necessary to keep the system operating smoothly, a list that is growing as trains and buses stay in service beyond their projected life and without crucial overhauls, according to the report.The agency spends $470 million a year on maintenance, but would need an additional $224 million to keep its backlog from growing, the report said.
“It’s fair to say that they are not keeping up with the safety standards that they themselves subscribe to,’’ said David F. D’Alessandro, the former John Hancock chairman who led the review. Governor Patrick and D'Alessandro will officially release the report today.
And although Dan Grabauskas was ousted this past summer, the report itself is not critical of MBTA management. Instead, it places most of the blame on a change in the way the MBTA was funded, a change approved by the Legislature in 2000. The idea at the time was to give the T a fixed annual subsidy, abandoning the unwieldy practice of using state money to pay off MBTA expenses at the end of each year. But the state underestimated the agency’s expenses by $558 million between 2000 and 2008, because of unrealistic projections for operating costs that were outside the T’s control.
For example, the original plan left no money for workers’ health care cost increases, even though they grew by 73 percent in the first eight years. The T, the state’s largest electricity customer, saw fuel and utility costs more than double over the same period. To balance the books, managers deferred debt payments, masking the size of the T’s problems. By 2013, the agency’s annual debt payment will reach $525 million.
Despite the agency’s financial woes, D’Alessandro recommends against raising fares after three increases in the past decade. Before adding still further to the burden on passengers, he wrote, “the riding public deserves to have tangible evidence that the MBTA is improving safety and service, not deteriorating further.’’
D’Alessandro, a bluntly spoken former corporate executive, also recommends against further expansion until the T can get its safety and maintenance problems under control. Simply controlling costs, he said, is no solution, given the magnitude of the agency’s problems and the need to employ large numbers of people to run the system.
In general, D’Alessandro recommends more transparency and more direct oversight of the MBTA by the new state transportation board, including a requirement that the T seek approval before it borrows any more money.
The strongest recommendation concerns safety. D’Alessandro implores the T’s new oversight board to conduct a high-level examination of what needs fixing. “With 51 projects classified as ‘a danger to life or limb of passengers and/or employees,’ prioritizing these projects against public safety needs is imperative,’’ he wrote.
*** Update 1:15 PM 11/04/09 ***
Governor Patrick announced during a press conference today that there will be no fare increases on the MBTA for the foreseeable future until these issues are hammered out. Thankfully, someone finally gets it. Riders have been lamenting this for years ... that the experience that we have almost daily on the T does not warrant additional fees to us until the agency gets its crap together.
This report didn't really offer anything new for those of us who take the T or commuter rail ... but hopefully it will get the ball rolling on solutions.
One delayed project highlighted in the report, which has been deemed critical to public safety, involves repair of a water leak on the Red Line between Alewife and Harvard stations. The $80 million project would replace a system of slabs and disks, designed to absorb train vibrations, that has been damaged by water leaks. In some areas, fasteners are corroding and the tracks are moving out of alignment, the report states, presenting “the possibility of train derailment.’’The system’s age and the lack of consistent repairs has also had a direct impact on service, according to the report.
A recent fire triggered by an old cable buried under muck on the Red Line shut down rush-hour service. It also forced some bus drivers to ferry those Red Line passengers, leaving parts of their regular routes uncovered and causing inconvenience across the system. The publicity forced the MBTA to agree to replace the cable, a $140 million project, “money that will be diverted from other projects such as overhauling vehicles,’’ the report states.
The 51 deferred projects deemed critically important carry a price tag of $543 million. But the T has a total of more than $3 billion in unfunded maintenance projects it considers necessary to keep the system operating smoothly, a list that is growing as trains and buses stay in service beyond their projected life and without crucial overhauls, according to the report.The agency spends $470 million a year on maintenance, but would need an additional $224 million to keep its backlog from growing, the report said.
“It’s fair to say that they are not keeping up with the safety standards that they themselves subscribe to,’’ said David F. D’Alessandro, the former John Hancock chairman who led the review. Governor Patrick and D'Alessandro will officially release the report today.
And although Dan Grabauskas was ousted this past summer, the report itself is not critical of MBTA management. Instead, it places most of the blame on a change in the way the MBTA was funded, a change approved by the Legislature in 2000. The idea at the time was to give the T a fixed annual subsidy, abandoning the unwieldy practice of using state money to pay off MBTA expenses at the end of each year. But the state underestimated the agency’s expenses by $558 million between 2000 and 2008, because of unrealistic projections for operating costs that were outside the T’s control.
For example, the original plan left no money for workers’ health care cost increases, even though they grew by 73 percent in the first eight years. The T, the state’s largest electricity customer, saw fuel and utility costs more than double over the same period. To balance the books, managers deferred debt payments, masking the size of the T’s problems. By 2013, the agency’s annual debt payment will reach $525 million.
Despite the agency’s financial woes, D’Alessandro recommends against raising fares after three increases in the past decade. Before adding still further to the burden on passengers, he wrote, “the riding public deserves to have tangible evidence that the MBTA is improving safety and service, not deteriorating further.’’
D’Alessandro, a bluntly spoken former corporate executive, also recommends against further expansion until the T can get its safety and maintenance problems under control. Simply controlling costs, he said, is no solution, given the magnitude of the agency’s problems and the need to employ large numbers of people to run the system.
In general, D’Alessandro recommends more transparency and more direct oversight of the MBTA by the new state transportation board, including a requirement that the T seek approval before it borrows any more money.
The strongest recommendation concerns safety. D’Alessandro implores the T’s new oversight board to conduct a high-level examination of what needs fixing. “With 51 projects classified as ‘a danger to life or limb of passengers and/or employees,’ prioritizing these projects against public safety needs is imperative,’’ he wrote.
*** Update 1:15 PM 11/04/09 ***
Governor Patrick announced during a press conference today that there will be no fare increases on the MBTA for the foreseeable future until these issues are hammered out. Thankfully, someone finally gets it. Riders have been lamenting this for years ... that the experience that we have almost daily on the T does not warrant additional fees to us until the agency gets its crap together.
This report didn't really offer anything new for those of us who take the T or commuter rail ... but hopefully it will get the ball rolling on solutions.
Tuesday, November 27, 2007
Tuesday Inbound Commute
Ah, late fall in New England. The warmest part of the day will be this morning. It was a balmy 60 degrees out when I arrived at the Grafton train station this morning.
I noticed something curious on the train this morning. . . all of the doors on all of the cars were open. Hmmm, so either "safety" is no longer a concern OR the conductors are taking some heat for the reports published last week about their working strike.
Well, Train Girl is happy that all of the doors on all the cars opened this morning for the inbound commute. I just hope all the doors are open tonight for the outbound commute.
However, Train Girl is not happy that the Worcester inbound train still arrived to South Station 18 minutes later than it's scheduled. PLUS the conductors didn't collect passes this morning. So I wonder how many people got a free ride into the city? I should be reimbursed $7.75 because that is the cost of a one-way ticket from Grafton to Boston on the Worcester commuter rail line.
Take one step forward, but you're still going backwards.
I noticed something curious on the train this morning. . . all of the doors on all of the cars were open. Hmmm, so either "safety" is no longer a concern OR the conductors are taking some heat for the reports published last week about their working strike.
Well, Train Girl is happy that all of the doors on all the cars opened this morning for the inbound commute. I just hope all the doors are open tonight for the outbound commute.
However, Train Girl is not happy that the Worcester inbound train still arrived to South Station 18 minutes later than it's scheduled. PLUS the conductors didn't collect passes this morning. So I wonder how many people got a free ride into the city? I should be reimbursed $7.75 because that is the cost of a one-way ticket from Grafton to Boston on the Worcester commuter rail line.
Take one step forward, but you're still going backwards.
Subscribe to:
Posts (Atom)


